MRU GmbH
SWG 100 User Manual
Page
62
of
141
Zeroing (Cycle phase details):
Z
EROING
configured.
ZEROING
Measuring site valves
Valves closed
Zeroing valve
Valve open
Duration
2min to 1 h
Recommendation
5min., in general not to be changed by user as
depending only on analyzer internal setup
Measurement SPX (Cycle phase details):
In the cycle phase deta
measurement time and the suction delay can be configured. Each sample point can be configured
individually. In the cycle phase details the following times can be set:
MEASUREMENT SPx
Measuring site valves
Valve of selected site is open, others closed
Zeroing valve
Valve closed
Duration
Phase duration: 2 min. to 24 h
Suction/response time: 30 sec. to 1h
Pure measurement: calculated
H2S-low: Activated/protect (Optional)
Stand-by (cycle phase details):
In the cycle
-
configured. In the cycle phase details the following times can be set:
Summary of Contents for SWG 100 biogas
Page 1: ...MRU GmbH SWG 100 User Manual Page 1 of 141...
Page 2: ...MRU GmbH SWG 100 User Manual Page 2 of 141...
Page 13: ...MRU GmbH SWG 100 User Manual Page 13 of 141 Picture above Sample gas flow diagram...
Page 81: ...MRU GmbH SWG 100 User Manual Page 81 of 141 Device info Path EXTRAS DEVICE INFO Structure...
Page 86: ......
Page 92: ......
Page 133: ...MRU GmbH SWG 100 User Manual Page 133 of 141 13 15 Option NDIR bench for 0 3 000ppm CO2 0 CH4...
Page 140: ...MRU GmbH SWG 100 User Manual Page 140 of 141 14 Declaration of conformity...
Page 141: ...MRU GmbH SWG 100 User Manual Page 141 of 141 V01 02 EN...