MRU GmbH
SWG 100 User Manual
Page
24
of
141
Plug connector definition:
WARNING
Electric voltage
Power the system down and protect from reconnecting,
before starting maintenance work.
Slit screws
Stripping length:
7 mm
Tightening torque min.-max.:
0,5-0,6 Nm
Conductor cross sections, which can be used:
Type of electric line
Conductor cross section min.-
max.
Solid
0,2-2,5 mm² (30-12 AWG)
Stranded
0,2-2,5 mm² (30-12 AWG)
Solid with ferrule (with/ or without
plastic)
0,25-2,5 mm²
Information for cables, which go through the cable gland M16:
It is recommended to use only electric lines with ferrules.
Summary of Contents for SWG 100 biogas
Page 1: ...MRU GmbH SWG 100 User Manual Page 1 of 141...
Page 2: ...MRU GmbH SWG 100 User Manual Page 2 of 141...
Page 13: ...MRU GmbH SWG 100 User Manual Page 13 of 141 Picture above Sample gas flow diagram...
Page 81: ...MRU GmbH SWG 100 User Manual Page 81 of 141 Device info Path EXTRAS DEVICE INFO Structure...
Page 86: ......
Page 92: ......
Page 133: ...MRU GmbH SWG 100 User Manual Page 133 of 141 13 15 Option NDIR bench for 0 3 000ppm CO2 0 CH4...
Page 140: ...MRU GmbH SWG 100 User Manual Page 140 of 141 14 Declaration of conformity...
Page 141: ...MRU GmbH SWG 100 User Manual Page 141 of 141 V01 02 EN...