MRU GmbH
SWG 100 User Manual
Page
60
of
141
8.8.
Cycle configuration
Path and default setting
E
XTRA
/
M
EASUREMENT CYCLE CONFIG
.
When the menu
EASUREMENT CYCLE CONFIG
is selected the user definable setting for the
measurement cycle will appear (see screenshot below).
General information
The menu point
CYCLE
allows the user to configure an individual measurement
cycle. Every installed sample point can be configured. For the configuration the user has the
following phases, which can be selected:
•
Zeroing.
•
Purging.
•
Stand-by.
•
The configuration is performed with the three function keys
F1
,
F2
and
F3
.
•
F1
:
Delete a phase.
•
F2
:
Make an Auto-config.
•
F3
:
Insert a new phase.
•
OK
:
View/change phase details
•
Left/right
:
Change the phase type.
Auto configuration
With
F2
-con
configurations.
•
One zeroing / cycle.
•
One zeroing / sample point.
The first program is for applications where the different measurement points have almost the same
gas concentrations. The zeroing is not necessary at every change of the measurement SPX.
The second program is for applications where the different measurement points have different gas
concentrations. A zeroing is recommended after every measurement point change.
The screenshots
comparison.
Screenshot shows default setting, when the
„M
EASUREMENT CYCLE CONFIG
.”
will be started the first
time.
Summary of Contents for SWG 100 biogas
Page 1: ...MRU GmbH SWG 100 User Manual Page 1 of 141...
Page 2: ...MRU GmbH SWG 100 User Manual Page 2 of 141...
Page 13: ...MRU GmbH SWG 100 User Manual Page 13 of 141 Picture above Sample gas flow diagram...
Page 81: ...MRU GmbH SWG 100 User Manual Page 81 of 141 Device info Path EXTRAS DEVICE INFO Structure...
Page 86: ......
Page 92: ......
Page 133: ...MRU GmbH SWG 100 User Manual Page 133 of 141 13 15 Option NDIR bench for 0 3 000ppm CO2 0 CH4...
Page 140: ...MRU GmbH SWG 100 User Manual Page 140 of 141 14 Declaration of conformity...
Page 141: ...MRU GmbH SWG 100 User Manual Page 141 of 141 V01 02 EN...