MRU GmbH
SWG 100 User Manual
Page
6
of
141
1.
General Information
1.1.
Weather and environmental conditions
The SWG100 BIOGAS analyser is designed for ambient temperatures of +5°C to
+45°C (without cabinet heater) resp. -10°C to +45°C (with cabinet heater).
The analyser is designed for indoor mounting. In case of outdoor mounting it is
important that the analyser is sufficiently protected against rain, sun and wind. In
case of outdoor mounting under extreme environmental conditions like high
humidity, salty sea air, etc. further protective measures are necessary. These should
be clarified with the manufacturer (MRU).
Any additional protective measures for outdoor mounting have to be provided by
the plant operator. The manufacturer (MRU) consults the plant operator in
choosing appropriate protective measures.
NOTE
The SWG100Biogas analyser is designed for sampling biogas with
condensate of max. 14ml/min.
If the sample biogas will be very wet (high condensate of more
than 14ml/min), then to protect the SWG100-Biogas analyser
please consider special precautions to remove the condensate.
If you not have your own feasible solution for this topic, please ask
MRU.
1.2.
Installation instructions
Installation instructions, which are described in chapter 3 of the operation manual,
have to be strictly adhered to.
WARNING
Please check correct installation before powering up the analyzer!
Please operate the analyzer only in upright position!
1.3.
General important instructions for the plant operator
To guarantee continuous operation of the SWG100 BIOGAS analyser, the functions,
processes and operation of the analyser have to be monitored regularly by the
plant operator especially in case of any initial installation. Thus, it will be possible
to take suitable measures to improve the availability and life time of the analyser.
As the plant operator gains more experience concerning the maintenance
requirements of the analyser, the monitoring frequency may be reduced to more
extended periods of time.
It is important that the filter-units, listed in chapter 10.1 of the operation manual,
are checked regularly and, if necessary, service parts are changed.
Summary of Contents for SWG 100 biogas
Page 1: ...MRU GmbH SWG 100 User Manual Page 1 of 141...
Page 2: ...MRU GmbH SWG 100 User Manual Page 2 of 141...
Page 13: ...MRU GmbH SWG 100 User Manual Page 13 of 141 Picture above Sample gas flow diagram...
Page 81: ...MRU GmbH SWG 100 User Manual Page 81 of 141 Device info Path EXTRAS DEVICE INFO Structure...
Page 86: ......
Page 92: ......
Page 133: ...MRU GmbH SWG 100 User Manual Page 133 of 141 13 15 Option NDIR bench for 0 3 000ppm CO2 0 CH4...
Page 140: ...MRU GmbH SWG 100 User Manual Page 140 of 141 14 Declaration of conformity...
Page 141: ...MRU GmbH SWG 100 User Manual Page 141 of 141 V01 02 EN...