MRU GmbH
SWG 100 User Manual
Page
22
of
141
5.3.
Connection of main power supply
WARNING
Electric voltage
Power the system down and protect for reconnecting, before
start maintenance work.
The analyzer needs a main power supply of 100-230 VAC/ 47-60 Hz.
The power supply may be found on the DIN-rail.
Details:
•
L and N phase on the circuit breaker (A in sketch below).
•
PE on the connection terminal (B in sketch below.)
100-230 Vac/ 47-60 Hz/ 300W
N
L
PE
Position of the DIN-rail. On the DIN-rail can be
found:
•
Main power supply.
•
I/O moduls (max. 10, 1 basic, all other
optional)
•
H2 TCD (optional).
A
B
N
L
PE
Pre-fuse
Summary of Contents for SWG 100 biogas
Page 1: ...MRU GmbH SWG 100 User Manual Page 1 of 141...
Page 2: ...MRU GmbH SWG 100 User Manual Page 2 of 141...
Page 13: ...MRU GmbH SWG 100 User Manual Page 13 of 141 Picture above Sample gas flow diagram...
Page 81: ...MRU GmbH SWG 100 User Manual Page 81 of 141 Device info Path EXTRAS DEVICE INFO Structure...
Page 86: ......
Page 92: ......
Page 133: ...MRU GmbH SWG 100 User Manual Page 133 of 141 13 15 Option NDIR bench for 0 3 000ppm CO2 0 CH4...
Page 140: ...MRU GmbH SWG 100 User Manual Page 140 of 141 14 Declaration of conformity...
Page 141: ...MRU GmbH SWG 100 User Manual Page 141 of 141 V01 02 EN...