MRU GmbH
SWG 100 User Manual
Page
20
of
141
5.2.
Installation of the analyzer
The analyzer is equipped with adapters for the wall mounting. The dimensions for the wall
mounting are shown in picture below.
ATTENTION
Operation of the analyzer
Only operate the analyzer in an upright position.
Only power the device up after it is correctly mounted.
General installation rules
•
Mount the device on a solid wall or steel rack.
•
Be sure, that the air circulation is not obstructed.
•
Let enough room for the tubing or piping.
For outdoor installation
Ensure that the analyzer is mounted on a rain and sun protected place (weather shade).
For indoor installation:
Ensure that the analyzer is installed on a dry and clean place. Be sure that the room is permanently
vented with fresh air.
Summary of Contents for SWG 100 biogas
Page 1: ...MRU GmbH SWG 100 User Manual Page 1 of 141...
Page 2: ...MRU GmbH SWG 100 User Manual Page 2 of 141...
Page 13: ...MRU GmbH SWG 100 User Manual Page 13 of 141 Picture above Sample gas flow diagram...
Page 81: ...MRU GmbH SWG 100 User Manual Page 81 of 141 Device info Path EXTRAS DEVICE INFO Structure...
Page 86: ......
Page 92: ......
Page 133: ...MRU GmbH SWG 100 User Manual Page 133 of 141 13 15 Option NDIR bench for 0 3 000ppm CO2 0 CH4...
Page 140: ...MRU GmbH SWG 100 User Manual Page 140 of 141 14 Declaration of conformity...
Page 141: ...MRU GmbH SWG 100 User Manual Page 141 of 141 V01 02 EN...