SERVICE STANDARDS
1 - 18
2.4 Standard Union Nuts
Nominal
diameter
Cap nut size
N
・
m kgf
・
m lbf
・
ft
63
M14
×
1.5
39 4 28.8
80
M16
×
1.5
49 5 36.1
100
M20
×
1.5
78 8 57.5
120
M22
×
1.5
98 10 72.3
150
M27
×
1.5
157 16 115.8
180
M30
×
1.5
196 20 144.6
200
M30
×
1.5
196 20 144.6
220
M33
×
1.5
245 25 180.7
254
M36
×
1.5
294 30 216.8
(Dry conditions)
2.5 Taper Bolts
Tightening into aluminum
Tightening into iron
Size
N
・
m
kgf
・
m
lbf
・
ft N
・
m
kgf
・
m
lbf
・
ft
NPTF1/16
4.90 to 7.85
0.5 to 0.8
3.6 to 5.8
7.85 to 11.8
0.8 to 1.2
5.8 to 8.7
PT1/8
7.85 to 11.8
0.8 to 1.2
5.8 to 8.7
14.7 to 21.6
1.5 to 2.2
10.8 to 15.9
PT1/4, NPTF1/4
19.6 to 29.4
2.0 to 3.0
14.5 to 21.7
34.3 to 44.1
3.5 to 4.5
25.3 to 32.5
PT3/8
―
―
―
53.9 to 73.5
5.5 to 7.5
39.8 to 54.2
Summary of Contents for diesel engines
Page 5: ......
Page 33: ...SERVICE STANDARDS 1 20 ...
Page 34: ...1 General Tools 1 22 2 Special Tools 1 23 TOOLS LIST ...
Page 37: ...TOOLS LIST 1 24 ...
Page 41: ...OVERHAUL TIMING 1 28 ...
Page 46: ......
Page 47: ......
Page 61: ...ENGINE MAIN PARTS DISASSEMBLY 2 16 ...
Page 99: ...FUEL SYSTEM REMOVAL 3 8 ...
Page 115: ...FUEL SYSTEM DISASSEMBLY INSPECTION AND REASSEMBLY 3 24 ...
Page 119: ...FUEL SYSTEM INSTALLATION 3 28 2 Governor Installing the governor Installation sequence ...
Page 123: ...FUEL SYSTEM INSTALLATION 3 32 ...
Page 131: ...OIL SYSTEM DISASSEMBLY INSPECTION AND REASSEMBLY 4 8 ...
Page 143: ...COOLING SYSTEM DISASSEMBLY INSPECTION AND REASSEMBLY 5 8 ...
Page 150: ......
Page 151: ......
Page 153: ...INLET AND EXHAUST SYSTEMS REMOVAL 6 4 ...
Page 159: ...INLET AND EXHAUST SYSTEMS INSTALLATION 6 10 ...
Page 160: ...1 Starter 7 2 2 Alternator 7 3 3 Stop Solenoid 7 4 4 Glow Plug 7 5 ELECTRICAL SYSTEM REMOVAL ...
Page 165: ...ELECTRICAL SYSTEM REMOVAL 7 6 ...
Page 189: ...ELECTRICAL SYSTEM INSTALLATION 7 30 ...
Page 207: ...MISCELLANEOUS 9 4 ...