Installation
Unpacking the robot system
FR series
3 - 5
R001781E
Fig. 3-4:
Unpack the SCARA robot RH-3FRHR
E
CAUTION:
Don't remove fixing plate
till installation is completed.
Packing box
Tape
Upper cover
Packing material
(Cardboard)
Robot-arm
base section
Hanging
tools
Packing
material
Tape
Fixing plate
Cut the tape
Remove the upper cover.
Remove the packing material.
Open the vinyl.
Hang the hook of the crane.
Hoist with crane and remove the
packing material.
Unpacking is completed.
Summary of Contents for MELFA RH-FRH-D
Page 2: ......
Page 4: ......
Page 6: ......
Page 16: ...Contents X ...
Page 22: ...Environmental conditions for operation Introduction 1 6 ...
Page 70: ...Grounding the robot system Installation 3 32 ...
Page 90: ...Teaching Box connection Connection 4 20 ...
Page 96: ...Switch on the robot system Startup 5 6 ...
Page 128: ...Dimensions Appendix A 18 ...
Page 130: ...A 20 Index Appendix ...
Page 131: ......
Page 132: ......
Page 133: ......
Page 134: ......
Page 135: ......
Page 136: ......
Page 137: ......
Page 138: ......
Page 139: ......
Page 140: ......
Page 141: ......
Page 142: ......
Page 143: ......
Page 144: ......
Page 145: ......
Page 146: ......
Page 147: ......
Page 148: ......
Page 149: ......
Page 150: ......
Page 151: ......
Page 152: ......
Page 153: ......
Page 154: ......
Page 155: ......
Page 156: ......
Page 157: ......
Page 158: ......
Page 159: ......
Page 160: ......
Page 161: ......
Page 162: ......
Page 163: ......
Page 164: ......
Page 165: ......