![background image](http://html1.mh-extra.com/html/mircom/flex-net-phase-ii/flex-net-phase-ii_application-manual_1805867005.webp)
5
1.0
Purpose
The purpose of this document is to describe the major changes from the Flex-Net Phase I Fire
Alarm Control System to the Flex-Net Phase II Fire Alarm Control System. It is intended
primarily for application engineers who build and configure these fire alarm control systems.
Familiarity with the Flex-Net Phase I Fire Alarm Control System is assumed. The following
topics will be discussed:
•
Ethernet Port Usage for Network Capability
•
Setting up and using a Web Server
•
BACnet implementation and functionality
•
Mass Notification System implementation and functionality
•
Use of Boolean Equations to operate Virtual Zones
•
Voice Evacuation and Digital Message Preparation
•
Relay Pulsing
•
Zone Latching
•
Autonomous Control Unit (ACU) and Local Operating Consoles (LOCs)
•
Firmware Loading
•
Configuration Loading
•
Hardware Layouts
Summary of Contents for Flex-Net Phase II
Page 1: ...Flex Net Phase II Application Guide LT 6045 Rev 1 October 2012 Application Guide...
Page 2: ......
Page 51: ...51 Hardware Layouts...
Page 115: ...114 Appendix B Using the Configurator...
Page 131: ......