Chapter 7 Installation
7.4.1 Connecting the meters
Important note:
l
All cabling work must be performed in the de-energised state.
l
Ensure installation is completed correctly.
l
Comply with the existing legal and/or operational directives.
l
Improper handling can cause injuries and/or damage to the instruments!
l
Run all data cables so that they do not pose a trip hazard and ensure that cables do not have
any sharp bends.
l
The myDatalogNANOamr must not be operated in the field with the lid open.
Connection of the sensors and power supply
1 Antenna connector
Cable length: 3m
3 Sensor cable with open ends (channel 1 and
2)
Cable length: 1m
2 Sealed sensor cable (channel 3 and 4)
Cable length: 0,12m
Channel
Colour
Function
Channel 1
Red
IN1
Blue
GND
Channel 2
Green
IN2
Yellow
GND
Sensor cable with open ends
Rev. 01
33
Summary of Contents for myDatalogNANOamr
Page 2: ......
Page 9: ...Chapter 2 Declaration of conformity Chapter 2 Declaration of conformity Rev 01 9 ...
Page 10: ......
Page 12: ......
Page 20: ......
Page 40: ......
Page 56: ...9 2 2 4 GPRS SIM tariff Selected SIM tariff 56 Rev 01 ...
Page 64: ......
Page 106: ......
Page 112: ......
Page 122: ......
Page 124: ......