Procedures for Testing with the DX Host
megger.com
107
2.
Touch
Yes
to answer the override message, which will appear in a dialog box like the
one shown below.
Figure 119. Override zero start message dialog.
3.
Test each subsequent coil by connecting the clips to each coil and pressing and holding
the
Start
button on the DX Host (or footswitch) for approximately 10 pulses.
Figure 120. PD ZSO, no PD events indicated.
Summary of Contents for Baker DX
Page 1: ......
Page 2: ......
Page 10: ...Table of Contents viii Baker DX 71 030 User Guide EN V10 www megger com...
Page 28: ...Baker DX Instrument Overview 18 Baker DX 71 030 User Guide EN V10 www megger com...
Page 38: ...Baker DX User Interface Overview 28 Baker DX 71 030 User Guide EN V10 www megger com...
Page 58: ...Setting up the Baker DX Tester 48 Baker DX 71 030 User Guide EN V10 www megger com...
Page 149: ...megger com 139 RIC Templates Figure 141 RIC template 1...
Page 150: ...RIC templates 140 Baker DX 71 030 User Guide EN V10 www megger com Figure 142 RIC template 2...
Page 155: ...Index megger com 145...
Page 156: ...megger com 146...