Using Baker DX Non-Test Functions
46 Baker DX 71-030 User Guide EN V10
www.megger.com
Partial discharge testing relies on the accurate detection of four key metrics: partial discharge
inception voltage (PDIV), repetitive partial discharge inception voltage (RPDIV), partial discharge
extinction voltage (PDEV), and repetitive partial discharge extinction voltage (RPDEV).
NOTE: The RPDIV and RPDEV voltages are determined by using data from multiple previous
surge pulses and comparing them to the current pulse.
If the voltage step is too high, you might step over the point where PD events first occur, so it is important
that voltage ramping occur in controlled and slowly-increasing steps to obtain inception voltages.
Likewise, extinction voltages should be acquired using slowly decreasing steps. Test time will increase
slightly, but you will obtain more accurate results.
From the
User Settings
screen, select a fast ramp rate of no more than 50 volts and a slow ramp
rate of no more than 10 volts to increase repeatability of RPDIV and RPDEV measurements.
Figure 49. Setting ramp rates for PD testing.
Summary of Contents for Baker DX
Page 1: ......
Page 2: ......
Page 10: ...Table of Contents viii Baker DX 71 030 User Guide EN V10 www megger com...
Page 28: ...Baker DX Instrument Overview 18 Baker DX 71 030 User Guide EN V10 www megger com...
Page 38: ...Baker DX User Interface Overview 28 Baker DX 71 030 User Guide EN V10 www megger com...
Page 58: ...Setting up the Baker DX Tester 48 Baker DX 71 030 User Guide EN V10 www megger com...
Page 149: ...megger com 139 RIC Templates Figure 141 RIC template 1...
Page 150: ...RIC templates 140 Baker DX 71 030 User Guide EN V10 www megger com Figure 142 RIC template 2...
Page 155: ...Index megger com 145...