Procedures for Testing with the DX Host
74 Baker DX 71-030 User Guide EN V10
www.megger.com
7.
Push and hold the
Start
(
PTT
) button (or footswitch) and the following controls appear.
Figure 77. Test submenu items.
NOTE: As a matter of best practice, perform the following steps in quick succession.
a.
If hands-free testing is desired (recommended), touch the
Lock PTT
icon. When
the icon changes to a yellow highlight as shown in the example below, release
the
Start
(
PTT
) button.
b.
Yellow highlights identify the test mode selected and locked controls. The
submenu will look like the following while the tests are running:
Figure 78. Test submenu items with Locked PTT and MOhm/PI selected
(both identified by yellow highlights).
c.
Rotate the
Voltage Output Control
knob on the front panel to raise the voltage
level to 500 volts and use the
Fast
or
Slow Ramp Rate
controls as needed to
quickly fine tune the level.
Figure 79. Ramp Rate controls.
d.
Touch the
MOhm/PI
icon to start the MegOhm insulation resistance (IR),
dielectric analysis (DA), and polarization index (PI) tests.
Summary of Contents for Baker DX
Page 1: ......
Page 2: ......
Page 10: ...Table of Contents viii Baker DX 71 030 User Guide EN V10 www megger com...
Page 28: ...Baker DX Instrument Overview 18 Baker DX 71 030 User Guide EN V10 www megger com...
Page 38: ...Baker DX User Interface Overview 28 Baker DX 71 030 User Guide EN V10 www megger com...
Page 58: ...Setting up the Baker DX Tester 48 Baker DX 71 030 User Guide EN V10 www megger com...
Page 149: ...megger com 139 RIC Templates Figure 141 RIC template 1...
Page 150: ...RIC templates 140 Baker DX 71 030 User Guide EN V10 www megger com Figure 142 RIC template 2...
Page 155: ...Index megger com 145...
Page 156: ...megger com 146...