
Installation
Check-out and Power-up
MagneMover LITE User Manual
67
Rockwell Automation Publication MMI-UM002E-EN-P - March 2016
System Power-up
After the MagneMover LITE transport system has been installed, all connections should be
checked and an initial power up should be performed before proceeding any further with the
installation process. This section describes the procedure for the initial installation check-out.
1.
Ensure that all of the installation procedures previously described in this chapter have
been completed.
2.
Ensure the system is properly grounded.
3.
Connect the MagneMover LITE transport system to the plant’s electrical services.
Ensure power remains off.
CAUTION
Crush Hazard
Moving mechanisms (vehicles and switches) have no
obstruction sensors.
Do not operate the MagneMover LITE transport system
without barriers in place or personal injury could result in the
squeezing or compression of fingers, hands, or other body
parts between moving mechanisms.
CAUTION
Automatic Movement
Whenever power is applied, the possibility of automatic
movement of the vehicles (pucks) on the MagneMover LITE
exists, which could result in personal injury.
CAUTION
High Voltage Hazard
110 VAC @ 8.5 A (220 VAC @ 5 A).
The AC circuit must be properly protected.