
HEADER OPERATION – D SERIES
169469/169470/169471
98
Revision E
6.5 D SERIES HEADER OPERATION
The M205 must be equipped with a draper drive
basic kit and a completion kit as shown.
If necessary, obtain the following kits from your
MacDon Dealer and install them in accordance
with the instructions supplied with the kits.
Kit Description
Kit Number
Base Kit
B5491
Completion B5496
Coupler B5497
6.5.1 HEADER
ATTACHMENT
IMPORTANT
To prevent damage to the lift system when
lowering header lift linkages without a
header or weight box attached to
windrower, ensure that float engagement
pin is installed in storage location (A), and
NOT installed at hole location (B).
a. If not installed, attach draper header boots
(supplied with header) to windrower lift linkage as
follows:
1. Remove pin (C) from boot (D).
(continued next page)
B
A
C
D
DRAPER HEADER REEL HYDRAULICS
DRAPER HEADER DRIVE HYDRAULICS
Summary of Contents for M205 2012
Page 1: ...M205 Self Propelled Windrower OPERATOR S MANUAL Part 169469 Rev E 25 ...
Page 11: ...SAFETY 169469 169470 169471 9 Revision E ...
Page 13: ...SAFETY 169469 169470 169471 11 Revision E Safety Sign Locations cont d ...
Page 186: ...MAINTENANCE AND SERVICING 169469 169470 169471 184 Revision E 7 10 13 3 Fuse Box Decal ...