47
Installing
the Inverter
2.4 Test Run
After the post-installation checklist has been completed, follow the instructions below to test
the inverter.
1
Turn on the power supply to the inverter. Ensure that the keypad display light is on.
2
Select the command source.
3
Set a frequency reference, and then check the following:
•
If V1 is selected as the frequency reference source, does the reference change
according to the input voltage at VR?
•
If V2 is selected as the frequency reference source, is the voltage/current selector
switch (SW4) set to ‘voltage’, and does the reference change according to the input
voltage?
•
If I2 is selected as the frequency reference source, is the voltage/current selector
switch (SW4) set to ‘current’, and does the reference change according to the input
current?
4
Set the acceleration and deceleration time.
5
Start the motor and check the following:
•
Ensure that the motor rotates in the correct direction (refer to the note below).
•
Ensure that the motor accelerates and decelerates according to the set times, and
that the motor speed reaches the frequency reference.
Note
If the forward command (Fx) is on, the motor should rotate counterclockwise when viewed from
the load side of the motor. If the motor rotates in the reverse direction, switch the cables at the U
and V terminals.
Summary of Contents for H100 0008-2(PLUS)
Page 26: ......
Page 30: ...Preparing the Installation 4 37 90 kW 3 Phase ...
Page 31: ...Preparing the Installation 5 110 132 kW 3 Phase ...
Page 32: ...Preparing the Installation 6 160 185 kW 3 Phase ...
Page 33: ...Preparing the Installation 7 220 250 kW 3 Phase ...
Page 34: ...Preparing the Installation 8 315 400 kW 3 Phase ...
Page 35: ...Preparing the Installation 9 500 kW 3 Phase ...
Page 46: ...Installing the Inverter 20 200 V 0 75 18 5kW 400 V 0 75 185kW 400 V 220 500kW ...
Page 48: ...Installing the Inverter 22 ...
Page 63: ...37 Installing the Inverter Input and Output Control Terminal Block Wiring Diagram ...
Page 207: ...Technical Specification 181 6 3 External Dimensions 0 75 30 kW 3 phase 37 90 kW 3 phase ...
Page 208: ...Technical Specification 182 110 185 kW 3 phase 220 500 kW 3 phase ...
Page 237: ...211 목차 EN IEC 61800 3 2018 EN 61800 5 1 2007 A1 2017 ...
Page 238: ...212 ...
Page 239: ...213 목차 ...