![LS ELECTRIC H100 0008-2(PLUS) Manual Download Page 13](http://html1.mh-extra.com/html/ls-electric/h100-0008-2-plus/h100-0008-2-plus_manual_1943796013.webp)
xiii
Quick Start Reference
Step
Parameter
Description
18
PRT-08 Select start at trip
reset
Select start at trip reset
Setting
Function
Bit
7
Bit
6
Bit
5
Bit
4
Bit
3
Bit
2
Bit
1
Bit
0
√
Standard Trips
except the below
√
Low Voltage Trip
√
Low Feedback
Trip
√
High Feedback
Trip
√
SetPoint Timeout
√
Overcycle Trip
√
High Flow Trip
√
Accum Flow Trip
19
PRT-09 Retry Number
Sets the number of restart trial when performing a trip reset.
20
PRT-20 OL Trip Select
0. None
1. Trip & Coast
2. Decel Stop
21
PRT-21 OL Trip Level
When the current supplied to the motor is greater than the preset
value of the overload trip level (OL Trip Level) and continues to
be supplied during the overload trip time (OL Trip Time), the
inverter output is either blocked according to the preset mode
from PRT-17 or slows to a stop after deceleration.
22
PRT-22 OL Trip Time
23
PRT-40 ETH Trip Sel
0. None
1. Trip & Coast
2. Decel Stop
24
PRT-41 Motor Cooling
0. Self-cool
1. Forced-cool
25
PRT-42 ETH 1 min
The amount of input current that can be continuously supplied to the
motor for 1 minute, based on the motor-rated current (BAS-13).
26
PRT-43 ETH Cont
Sets the amount of current with the ETH function activated. The range
below details the set values that can be used during continuous
operation without the protection function
Summary of Contents for H100 0008-2(PLUS)
Page 26: ......
Page 30: ...Preparing the Installation 4 37 90 kW 3 Phase ...
Page 31: ...Preparing the Installation 5 110 132 kW 3 Phase ...
Page 32: ...Preparing the Installation 6 160 185 kW 3 Phase ...
Page 33: ...Preparing the Installation 7 220 250 kW 3 Phase ...
Page 34: ...Preparing the Installation 8 315 400 kW 3 Phase ...
Page 35: ...Preparing the Installation 9 500 kW 3 Phase ...
Page 46: ...Installing the Inverter 20 200 V 0 75 18 5kW 400 V 0 75 185kW 400 V 220 500kW ...
Page 48: ...Installing the Inverter 22 ...
Page 63: ...37 Installing the Inverter Input and Output Control Terminal Block Wiring Diagram ...
Page 207: ...Technical Specification 181 6 3 External Dimensions 0 75 30 kW 3 phase 37 90 kW 3 phase ...
Page 208: ...Technical Specification 182 110 185 kW 3 phase 220 500 kW 3 phase ...
Page 237: ...211 목차 EN IEC 61800 3 2018 EN 61800 5 1 2007 A1 2017 ...
Page 238: ...212 ...
Page 239: ...213 목차 ...