![LS ELECTRIC H100 0008-2(PLUS) Manual Download Page 60](http://html1.mh-extra.com/html/ls-electric/h100-0008-2-plus/h100-0008-2-plus_manual_1943796060.webp)
Installing the Inverter
34
315
–500kW (3-Phase)
N(-)
P(+)
Terminal Labels
Name
Description
R(L1) / S(L2) / T(L3) AC power input terminal
Mains supply AC power connections.
P(+) / N(-)
DC link terminal
(or Brake unit terminals)
DC voltage terminals.
(or Brake unit wiring connection)
U / V / W
Motor output terminals
3-phase induction motor wiring
connections.
Summary of Contents for H100 0008-2(PLUS)
Page 26: ......
Page 30: ...Preparing the Installation 4 37 90 kW 3 Phase ...
Page 31: ...Preparing the Installation 5 110 132 kW 3 Phase ...
Page 32: ...Preparing the Installation 6 160 185 kW 3 Phase ...
Page 33: ...Preparing the Installation 7 220 250 kW 3 Phase ...
Page 34: ...Preparing the Installation 8 315 400 kW 3 Phase ...
Page 35: ...Preparing the Installation 9 500 kW 3 Phase ...
Page 46: ...Installing the Inverter 20 200 V 0 75 18 5kW 400 V 0 75 185kW 400 V 220 500kW ...
Page 48: ...Installing the Inverter 22 ...
Page 63: ...37 Installing the Inverter Input and Output Control Terminal Block Wiring Diagram ...
Page 207: ...Technical Specification 181 6 3 External Dimensions 0 75 30 kW 3 phase 37 90 kW 3 phase ...
Page 208: ...Technical Specification 182 110 185 kW 3 phase 220 500 kW 3 phase ...
Page 237: ...211 목차 EN IEC 61800 3 2018 EN 61800 5 1 2007 A1 2017 ...
Page 238: ...212 ...
Page 239: ...213 목차 ...