![LS ELECTRIC H100 0008-2(PLUS) Manual Download Page 18](http://html1.mh-extra.com/html/ls-electric/h100-0008-2-plus/h100-0008-2-plus_manual_1943796018.webp)
Quick Start Reference
Q
xviii
6. High/Low Feedback Detection
Low/High feedback detection detects whether PID feedback is higher than high feedback level or
lower than low feedback level to trigger Warning or Trip&Coast stop.
▶
AP2-48 High Feedback Detection Mode
▶
AP2-49 High Feedback Level Fault Delay Time
▶
AP2-50 High Feedback Level
PID
Feedback
Output
Freq.
High Fdb
Digital
Output
High Fdb
Trip
High
Fdb lvl
Hysteresis
High Fdb
Time
High Fdb
Time
▶
AP2-51 Low Feedback Mode
▶
AP2-52 Low Feedback Level Fault Delay Time
▶
AP2-53 Low Feedback Level
▶
AP2-54 Hysteresis Level
PID
Feedback
Output
Freq.
Low Fdb
Digital
Output
Low Fdb
Trip
Low
Fdb
level
Low Fdb
Time
Low Fdb
Time
Hysteresis
Summary of Contents for H100 0008-2(PLUS)
Page 26: ......
Page 30: ...Preparing the Installation 4 37 90 kW 3 Phase ...
Page 31: ...Preparing the Installation 5 110 132 kW 3 Phase ...
Page 32: ...Preparing the Installation 6 160 185 kW 3 Phase ...
Page 33: ...Preparing the Installation 7 220 250 kW 3 Phase ...
Page 34: ...Preparing the Installation 8 315 400 kW 3 Phase ...
Page 35: ...Preparing the Installation 9 500 kW 3 Phase ...
Page 46: ...Installing the Inverter 20 200 V 0 75 18 5kW 400 V 0 75 185kW 400 V 220 500kW ...
Page 48: ...Installing the Inverter 22 ...
Page 63: ...37 Installing the Inverter Input and Output Control Terminal Block Wiring Diagram ...
Page 207: ...Technical Specification 181 6 3 External Dimensions 0 75 30 kW 3 phase 37 90 kW 3 phase ...
Page 208: ...Technical Specification 182 110 185 kW 3 phase 220 500 kW 3 phase ...
Page 237: ...211 목차 EN IEC 61800 3 2018 EN 61800 5 1 2007 A1 2017 ...
Page 238: ...212 ...
Page 239: ...213 목차 ...