Perform Basic Operations
57
Parameter Setting Mode
The following table lists the functions groups under Parameter mode.
Function Group Name Keypad Display Description
Drive
DRV
Configures basic operation parameters. These
include jog operation, motor capacity evaluation, and
torque boost.
Basic
BAS
Configures basic operation parameters. These
parameters include motor parameters and multi-step
frequency parameters.
Advanced
ADV
Configures acceleration or deceleration patterns,
frequency limits, energy saving features, and,
regeneration prevention features.
Control
CON
Configures the features related to speed search and
KEB (kinetic energy buffering).
Input Terminal
IN
Configures input terminal
–related features, including
digital multi
–functional inputs and analog inputs.
Output Terminal
OUT
Configures output terminal
–related features,
including digital multi
–functional outputs and analog
outputs.
Communication
COM
Configures the USB-related features and
communication features for the RS-485, Modbus-
RTU, LS Bus, Metasys N2, and BACnet. Optional
communication module related features may be
configured as well, if one is installed.
PID process
PID
Configures the PID control-related features.
Application 1
AP1
Configures the Sleep Boost, SoftFill, and Multiple
motor control (MMC) features related to the PID
control.
Application 2
AP2
Configures the HVAC features by setting the features
such as load tuning, pump cleaning, and pay back
counter.
Application 3
AP3
Configures the time event-related features.
Application 4
AP4
Configures the time flow monitoring and PI aux
control features.
Protection
PRT
Configures motor and inverter protection features.
Summary of Contents for H100 0008-2(PLUS)
Page 26: ......
Page 30: ...Preparing the Installation 4 37 90 kW 3 Phase ...
Page 31: ...Preparing the Installation 5 110 132 kW 3 Phase ...
Page 32: ...Preparing the Installation 6 160 185 kW 3 Phase ...
Page 33: ...Preparing the Installation 7 220 250 kW 3 Phase ...
Page 34: ...Preparing the Installation 8 315 400 kW 3 Phase ...
Page 35: ...Preparing the Installation 9 500 kW 3 Phase ...
Page 46: ...Installing the Inverter 20 200 V 0 75 18 5kW 400 V 0 75 185kW 400 V 220 500kW ...
Page 48: ...Installing the Inverter 22 ...
Page 63: ...37 Installing the Inverter Input and Output Control Terminal Block Wiring Diagram ...
Page 207: ...Technical Specification 181 6 3 External Dimensions 0 75 30 kW 3 phase 37 90 kW 3 phase ...
Page 208: ...Technical Specification 182 110 185 kW 3 phase 220 500 kW 3 phase ...
Page 237: ...211 목차 EN IEC 61800 3 2018 EN 61800 5 1 2007 A1 2017 ...
Page 238: ...212 ...
Page 239: ...213 목차 ...