Technical Specification
194
6.7.2 Terminal arrangement
Group 1:
Group 2:
Terminals
Functions
G
Ground Terminal
B2
Terminal for connection with B2 of DBU
B1
Terminal for connection with B1 of DBU
N
Terminal for connection with N of Inverter
P
Terminal for connection with P1 of Inverter
*
Note: READ DBU User manual certainly when selecting DB resistors.
Group 3:
Group 4:
Terminals
Functions
G
Ground Terminal
B2
Terminal for connection with B2 of DBU
B1
Terminal for connection with B1 of DBU
N
Terminal for connection with N of Inverter
P
Terminal for connection with P of Inverter
B1
N
P
G
B2
N
B2
P/B1
G
Summary of Contents for H100 0008-2(PLUS)
Page 26: ......
Page 30: ...Preparing the Installation 4 37 90 kW 3 Phase ...
Page 31: ...Preparing the Installation 5 110 132 kW 3 Phase ...
Page 32: ...Preparing the Installation 6 160 185 kW 3 Phase ...
Page 33: ...Preparing the Installation 7 220 250 kW 3 Phase ...
Page 34: ...Preparing the Installation 8 315 400 kW 3 Phase ...
Page 35: ...Preparing the Installation 9 500 kW 3 Phase ...
Page 46: ...Installing the Inverter 20 200 V 0 75 18 5kW 400 V 0 75 185kW 400 V 220 500kW ...
Page 48: ...Installing the Inverter 22 ...
Page 63: ...37 Installing the Inverter Input and Output Control Terminal Block Wiring Diagram ...
Page 207: ...Technical Specification 181 6 3 External Dimensions 0 75 30 kW 3 phase 37 90 kW 3 phase ...
Page 208: ...Technical Specification 182 110 185 kW 3 phase 220 500 kW 3 phase ...
Page 237: ...211 목차 EN IEC 61800 3 2018 EN 61800 5 1 2007 A1 2017 ...
Page 238: ...212 ...
Page 239: ...213 목차 ...