Table of Functions
141
Code
(Comm.
Address)
Name
LCD
Display
Setting Range
Initial Value
Prop
erty*
Ref.
AP3-19
(0h1B13)
Time Period3 Day of
the week
configuration
Period3
Day
000 0000
–
111 1111 (Bit)
000 0000
O
AP3-20
(0h1B14)
Time Period4
Start time
configuration
Period4
Start T
0: 00
–24: 00
(min)
24: 00
O
AP3-21
(0h1B15)
Time Period4
End time
configuration
Period4
Stop T
Period4 Start T
–
24: 00 (min)
24: 00
O
AP3-22
(0h1B16)
Time Period
Day of the week
configuration
Period4
Day
000 0000
–
111 1111 (Bit)
000 0000
O
AP3-30
(0h1B1E)
Except1 Date
Start time
configuration
Except1
Start T
0: 00
–24: 00
(min)
24: 00
O
AP3-31
(0h1B1F)
Except1 Date
End time
configuration
Except1
Stop T
Except1 StartT
–
24: 00 (min)
24: 00
O
AP3-32
(0h1B20)
Except1 Date
configuration
Except1D
ate
01/01
–12/31
(Date)
01/01
O
AP3-33
(0h1B21)
Except2 Date Start
time configuration
Except2
Start T
0: 00
–24: 00
(min)
24: 00
O
AP3-34
(0h1B22)
Except2 Date Stop
time configuration
Except2
Stop T
Except2 StartT
–
24: 00 (min)
24: 00
O
AP3-35
(0h1B23)
Except2 Date
configuration
Except2D
ate
01/01
–12/31
(Date)
01/01
O
AP3-36
(0h1B24)
Except3 Date Start
time configuration
Except3
Start T
0: 00
–24: 00
(min)
24: 00
O
AP3-37
(0h1B25)
Except3 Date End
time configuration
Except3
Stop T
Except3 StartT
–
24: 00 (min)
24: 00
O
AP3-38
(0h1B26)
Except3
Date configuration
Except3D
ate
01/01
–12/31
(Date)
01/01
O
AP3-39
(0h1B27)
Except4 Date Start
time configuration
Except4
Start T
0: 00
–24: 00
(min)
24: 00
O
Summary of Contents for H100 0008-2(PLUS)
Page 26: ......
Page 30: ...Preparing the Installation 4 37 90 kW 3 Phase ...
Page 31: ...Preparing the Installation 5 110 132 kW 3 Phase ...
Page 32: ...Preparing the Installation 6 160 185 kW 3 Phase ...
Page 33: ...Preparing the Installation 7 220 250 kW 3 Phase ...
Page 34: ...Preparing the Installation 8 315 400 kW 3 Phase ...
Page 35: ...Preparing the Installation 9 500 kW 3 Phase ...
Page 46: ...Installing the Inverter 20 200 V 0 75 18 5kW 400 V 0 75 185kW 400 V 220 500kW ...
Page 48: ...Installing the Inverter 22 ...
Page 63: ...37 Installing the Inverter Input and Output Control Terminal Block Wiring Diagram ...
Page 207: ...Technical Specification 181 6 3 External Dimensions 0 75 30 kW 3 phase 37 90 kW 3 phase ...
Page 208: ...Technical Specification 182 110 185 kW 3 phase 220 500 kW 3 phase ...
Page 237: ...211 목차 EN IEC 61800 3 2018 EN 61800 5 1 2007 A1 2017 ...
Page 238: ...212 ...
Page 239: ...213 목차 ...