EN
27
Display
Operating Procedure
Description
Programming Mode
Start Up Procedures
The following is the procedure for turning
on the power to the espresso machine.
• Please follow the procedures carefully
to avoid any damage to the espresso
machine.
• Proceed checking for water connection
to the espresso machine.
• Proceed making sure you have filled the
boilers.
• For the MP version, ongoing warming is
indicated by the timer located on the
groups using digit rotation.
Turn the Main Switch to the 1 position.
The message shown to the left will be displayed when the espresso machine is switched on.
To complete the start up process, press any button. The screen shown to the left will be displayed. The
rectangles next to CB and SB indicate the warming up of the water contained in the boilers. When the set
temperature is reached, these rectangles turn off and all the lights of the buttons turn on. Now the machine
is ready for use. During the normal operation of the machine, the flashing of the rectangles indicates the
intermittent heating necessary for maintaining the temperature.
NOTE:
Ensure all air is removed from the group prior to staring the espresso machine.
This only needs to be completed once during the initial setup or when water is drained from the coffee boiler.
Instructions for bleeding the groups of air can be found in the Installation Guide.
Turning the Espresso
Machine On
HAZARDOUS VOLTAGE DISCONNECT FROM POWER
SUPPLY BEFORE SERVICING
WARNING
OFF
00:00
LaMarzocco 00:00
CB
O
93.8
°
C SB
O
OFF
00:00
1
3
2
Summary of Contents for Linea PB
Page 111: ...EN 111 ...
Page 112: ......