Ch.2 Unpacking and Installation
< 27 >
DRYPRO MODEL 771 INSTALLATION MANUAL Ver.1.00 2003.10
2.2
Unpacking
The procedure for unpacking the DRYPRO 771 is described below.
The weight of the DRYPRO 771 is approximately 155kg (without stand) or
175kg(with stand) and the weight of the packing is approximately 189kg (without
stand) or 205kg (with stand).
Allow adequate space when transporting or moving the unit and carry out work with
due care. Work should be carried out by at least 2 personnel.
1
Holding the packing band with one hand, use a
cutter to remove.
Do not stand directly in
front of the packing
band when cutting. The
band may rebound and
cause injury when cut.
2
Remove the lid from the outer box.
3
Screw the four knobs holding the lock piece in
place to the left and remove.
3
4
4
Remove the lock piece (4) from the outer box.
5
Remove the outer box.
The lock piece knobs
can be removed easily
using a pair radio pliers.
In this chapter,
unpacking procedure is
detailed as to the case
of DRYPRO 771
without stand.
However, you can
follow the same
procedure for DRYPRO
771 with stand.
When disposing of the
packing materials,
follow the regulations
and rules of the local
government.
Summary of Contents for DRYPRO 771
Page 10: ...Preface 8 DRYPRO MODEL 771 INSTALLATION MANUAL Ver 1 00 2003 10...
Page 26: ...Ch 1 Before Installation 24 DRYPRO MODEL 771 INSTALLATION MANUAL Ver 1 00 2003 10...
Page 54: ...Ch 2 Unpacking and Installation 52 DRYPRO MODEL 771 INSTALLATION MANUAL Ver 1 00 2003 10...
Page 82: ...Ch 4 Checking the Image 80 DRYPRO MODEL 771 INSTALLATION MANUAL Ver 1 00 2003 10...
Page 96: ...Ch 4 Checking the Image 94 DRYPRO MODEL 771 INSTALLATION MANUAL Ver 1 00 2003 10...