2- 8
Keysight B1507A User’s Guide, Edition 1
Installation
Inspection and Installation
Inspection and Installation
Do the following when this instrument arrived.
•
•
•
“To Connect Selector and Test Fixture”
•
“To Check Operation of Selector”
Do the following setup if you need.
•
“To Change Windows Logon Setting”
•
•
To Inspect Shipment
1. Before unpacking any components, inspect all boxes for any signs of damage
that might have occurred during shipment, such as:
•
dents
•
scratches
•
cuts
•
water marks
If you suspect any damage, contact Keysight Technologies.
2. When you open the boxes that contain the instrument and accessories, check the
components against the contents lists attached to the boxes.
If anything is missing, contact Keysight Technologies.
After the inspection, move the instrument and accessories to the installation site. For
the requirements for the installation site, see “Requirements” on page 2-4.
Summary of Contents for B1507A
Page 1: ...Keysight Technologies B1507A Power Device Capacitance Analyzer User s Guide...
Page 27: ...1 Introduction...
Page 59: ...2 Installation...
Page 79: ...3 How To Perform Measurement...
Page 109: ...4 GUI Reference...
Page 189: ......