![background image](http://html2.mh-extra.com/html/keithley/6514/6514_instruction-manual_4064199146.webp)
Limit Tests
10-15
Programming example
The following command sequence will test DUT using the limit tests example shown in Fig-
ure 10-2.
*RST
‘ Restore
RST
defaults (Volts function).
CALC2:LIM:UPP 2
‘ Set upper limit for Limit 1 (2V).
CALC2:LIM:LOW -2
‘ Set lower limit for Limit 1 (-2V).
CALC2:LIM:STAT ON
‘ Enable Limit 1 test.
CALC2:LIM2:UPP 1
‘ Set upper limit for Limit 2 (1V).
CALC2:LIM2:LOW -1
‘ Set lower limit for Limit 2 (-1V).
CALC2:LIM2:STAT ON
‘ Enable Limit 2 test.
‘ Connect DUT to input.
INIT
‘ Perform tests on DUT (one measure-
ment).
CALC2:LIM:FAIL?
‘ Return result of Limit 1 test.
CALC2:LIM2:FAIL?
‘ Return result of Limit 2 test.
Summary of Contents for 6514
Page 203: ...14 CommonCommands...
Page 207: ...15 SCPISignalOriented MeasurementCommands...
Page 235: ...18 PerformanceVerification...
Page 254: ...19 Calibration...
Page 274: ...20 RoutineMaintenance...
Page 278: ...A Specifications...
Page 282: ...B StatusandErrorMessages...
Page 288: ...C GeneralMeasurement Considerations...
Page 294: ...D DDCEmulationCommands...
Page 299: ...E ExamplePrograms...
Page 306: ...F IEEE 488BusOverview...
Page 320: ...G IEEE 488andSCPI ConformanceInformation...
Page 324: ...H CalibrationOptions...