![background image](http://html2.mh-extra.com/html/keithley/6514/6514_instruction-manual_4064199134.webp)
Limit Tests
10-3
A test is only performed if it is enabled. Therefore, you can perform a single-stage test or a
2-stage test. In the flowchart (Figure 10-3), operation simply proceeds through a disabled test.
Table 10-1
Test limit display messages
Display
Message
Limit 1
Test Result
Limit 2
Test Result
:OK
Pass
Pass
:L1
Fail
Not Performed
:L2
Pass
Fail
Pass
?
Start
Measure
DUT
Yes
Limit 1
Test
No
Display
“L1”
Limit 2
Test
Pass
?
Display
“L2”
Display
“OK”
Yes
No
End
Figure 10-3
Operation model
for limit test
Summary of Contents for 6514
Page 203: ...14 CommonCommands...
Page 207: ...15 SCPISignalOriented MeasurementCommands...
Page 235: ...18 PerformanceVerification...
Page 254: ...19 Calibration...
Page 274: ...20 RoutineMaintenance...
Page 278: ...A Specifications...
Page 282: ...B StatusandErrorMessages...
Page 288: ...C GeneralMeasurement Considerations...
Page 294: ...D DDCEmulationCommands...
Page 299: ...E ExamplePrograms...
Page 306: ...F IEEE 488BusOverview...
Page 320: ...G IEEE 488andSCPI ConformanceInformation...
Page 324: ...H CalibrationOptions...