2308-900-01 Rev. A / July 2008
I-1
Index
Numerics
488
...........................................................9-7
A
Ambient temperature
..............................12-2
Calibration
......................................13-2
AMP
........................................................4-11
Analog output
.........................................2-22
Angle Brackets
.........................................6-8
ASCII format
...........................................10-5
AUTO TIME
..............................................4-6
Average readings
...................................2-17
B
Battery channel
connections for 50 mA current
verification tests
...........................12-12
connections for 500 mA current
verification tests
...........................12-11
Fastest transient response connection
2-4
Preferred connection
(maximum stability)
..........................2-3
BOTHOUTOFF
.............................2-14
,
2-15
BOTHOUTON
..............................2-14
,
2-15
Bus
...........................................................9-8
C
Calibration
Acquiring date and count by remote
13-17
Ambient temperature
......................13-2
Changing the code
.......................13-15
Changing the code by remote
......13-16
Changing the code from the
front panel
....................................13-16
Connections
Resistor
13-3
Considerations
...............................13-2
Cycle
..............................................13-3
Enter dates and save
...................13-10
Environmental conditions
...............13-2
Front panel
.....................................13-4
Line power
......................................13-2
Prepare the Model 2306
.....13-4
,
13-11
Program date
...............................13-14
Recommended equipment
.............13-3
Remote
.........................................13-11
Remote display
............................13-11
Remote procedure
.......................13-11
Resetting the code
.......................13-16
Resistor considerations
..................13-3
Temperature and relative humidity
.13-2
Viewing date and count
............... 13-17
Viewing date and count from the
front panel
.................................... 13-17
Warm-up period
............................. 13-2
Calibration steps
Perform battery channel
.... 13-5
,
13-12
Perform charger channel
... 13-9
,
13-13
Case sensitivity
........................................ 6-9
Charger channel
4-wire remote sense connection from
the DUT to the ouput
....................... 2-5
connections for DVM accuracy
verification
.................................... 12-15
connections for voltage calibration
13-9
Charger Control Circuit Testing
............. 2-19
Clearing registers and queues
................. 7-3
Command execution rules
..................... 6-11
Command notes
IEEE-488.2 common commands
and queries
...................................... 8-2
Long integration measurements
.... 4-12
Measure V and I, and DVM input
... 2-18
Outputting voltage and current
...... 2-14
Pulse current measurements
......... 3-14
SCPI commands—data format
...... 10-5
SCPI commands—display
............. 10-2
Signal oriented measurement
commands and queries
................... 9-3
Command path rules
.............................. 6-10
Command words
...................................... 6-7
Common and SCPI commands
Event enable registers
................... 7-13
Common commands
*IDN? — identification query
............ 8-2
*OPC — operation complete
........... 8-3
*OPC and *OPC? commands
.......... 8-3
*OPC? — operation complete query
8-3
*RCL — recall
................................. 8-3
*RST — reset
................................... 8-4
*SAV — save
.................................. 8-3
*TRG1 — trigger
.............................. 8-4
*TRG2 — trigger
.............................. 8-4
*TST? — self-test query
.................. 8-4
*WAI — wait-to-continue
.................. 8-4
Common commands and queries
............ 8-2
Condition registers
................................. 7-12
Connections
5 A, 500 mA, and 50 mA current
calibration
...................................... 13-7
5 mA current verification tests
..... 12-14
5mA range calibration
.................... 13-8
GPIB bus
......................................... 6-2
Summary of Contents for 2308
Page 2: ......
Page 12: ...This page left blank intentionally...
Page 32: ...This page left blank intentionally...
Page 106: ...This page left blank intentionally...
Page 140: ...This page left blank intentionally...
Page 208: ...This page left blank intentionally...
Page 220: ...This page left blank intentionally...