9 OP 3D Pro Pre-sales check list
154
9.6 Computer Specifications
9.7 Backup Specifications
9.8 DICOM Services SCP
See chapter 4 for PC requirements.
The
CLINI-
VIEW™database
must be backed up
with an appropriate
backup system.
It is recommended to use a
suitable backup system that
can easily be removed for off-
site storage. For more info
about database backup,
please refer to the CLINI-
VIEW™software Installation
Manual.
End User
IDENTIFIERS
AE Title
Port number
IP Address
Worklist SCP
Storage SCP
Storage Commitment SCP
Print SCP
Query / Retrieve SCP
Summary of Contents for ORTHOPANTOMOGRAPH OP 3D Pro
Page 2: ......
Page 4: ......
Page 8: ...iv rev...
Page 18: ...1 Introduction 10...
Page 27: ...2 Unit description 19 2 6 Unit movements Panoramic unit movements R C J D...
Page 29: ...2 Unit description 21...
Page 30: ...2 Unit description 22...
Page 38: ...4 PC requirements 30...
Page 54: ...5 Installing the unit 46 4 Fasten the covers...
Page 67: ...5 Installing the unit 59 C C D D Top cover of the column E E...
Page 104: ...7 Cephalometric calibration and alignment 96...
Page 111: ...7 Cephalometric calibration and alignment 103 3 Tighten the locking nut...
Page 117: ...7 Cephalometric calibration and alignment 109...
Page 128: ...8 Special procedures 120 6 Remove the arm from the column 4 nuts 7 Disassemble the arm...
Page 132: ...8 Special procedures 124 right handed assembly Prism assembly for the left handed cephalostat...
Page 158: ...8 Special procedures 150...
Page 165: ...9 OP 3D Pro Pre sales check list 157 9 11 Notes comments...
Page 166: ...9 OP 3D Pro Pre sales check list 158 9 12 Dimensions 463...
Page 167: ...9 OP 3D Pro Pre sales check list 159 9 13 Dimensions with cephalostat...