8 Special procedures
134
4.
An s2terminal connection is established to the unit. A
list of command shortcuts (macros) is printed. These
may be used to streamline the update process. Alterna-
tively, the commands can be typed in manually.
8.7.2
Software update
The embedded software release package consist of a
number of compatible software components. They can be
updated either:
manually - each software component is programmed
separately or
automatically - all software components are
programmed using a single command.
Automatic update is recommended for normal updates.
Manual update may be necessary in cases where the
automatic update fails or for troubleshooting purposes.
8.7.2.1
Automatic update
Press the F10 button and press enter, or type in manually:
xu R<ver_major>.<ver_minor>
Example:
xu R2.00
An automatic update of the embedded software is
performed. Follow the instructions printed in the s2terminal
prompt and wait for the update to complete.
8.7.2.2
Manual update
When performing a manual update, the main/cephalostat
CPU core and firmware must be updated in a given order.
For other software components, the recommended order is
the following:
1) Update the Main CPU R3220 core.
2) Power off and on again.
3) Update the Main CPU firmware.
4) Update the GUI software.
5) Update the R3400 firmware and core.
Summary of Contents for ORTHOPANTOMOGRAPH OP 3D Pro
Page 2: ......
Page 4: ......
Page 8: ...iv rev...
Page 18: ...1 Introduction 10...
Page 27: ...2 Unit description 19 2 6 Unit movements Panoramic unit movements R C J D...
Page 29: ...2 Unit description 21...
Page 30: ...2 Unit description 22...
Page 38: ...4 PC requirements 30...
Page 54: ...5 Installing the unit 46 4 Fasten the covers...
Page 67: ...5 Installing the unit 59 C C D D Top cover of the column E E...
Page 104: ...7 Cephalometric calibration and alignment 96...
Page 111: ...7 Cephalometric calibration and alignment 103 3 Tighten the locking nut...
Page 117: ...7 Cephalometric calibration and alignment 109...
Page 128: ...8 Special procedures 120 6 Remove the arm from the column 4 nuts 7 Disassemble the arm...
Page 132: ...8 Special procedures 124 right handed assembly Prism assembly for the left handed cephalostat...
Page 158: ...8 Special procedures 150...
Page 165: ...9 OP 3D Pro Pre sales check list 157 9 11 Notes comments...
Page 166: ...9 OP 3D Pro Pre sales check list 158 9 12 Dimensions 463...
Page 167: ...9 OP 3D Pro Pre sales check list 159 9 13 Dimensions with cephalostat...