• Raise the lift mast (15) and load it.
• Set down the lift mast (15) safely:
• Place the mast (15) carefully on two identical pallets (83).
• Secure the lift mast (15) with the lashing straps (82) tightly on the pallets (83).
• Tighten the lashing straps (82) with their tensioners.
Loading the lift mast by crane is now complete.
57
04.19 en-GB
Summary of Contents for EFX 410
Page 1: ...EFX 410 413 03 13 Operating instructions 51296679 04 19 en GB EFX 410 EFX 413 ...
Page 2: ...2 ...
Page 4: ...4 04 19 en GB ...
Page 12: ...0506 GB 2 0506 GB 2 ...
Page 72: ...70 04 19 en GB ...
Page 90: ...88 04 19 en GB ...
Page 250: ...248 04 19 en GB ...
Page 261: ...The Operator specific settings menu now opens 259 04 19 en GB ...
Page 376: ......
Page 380: ...02 16 EN 6 ...
Page 382: ...02 16 EN 8 14 Safety instructions and warning information ...
Page 404: ......