Installation Checklist
General
Have the correct number and location of extract fans/terminals been installed?
Is the installation complete with no obvious defects present?
Has all protection/packaging been removed such that the system is fully functional?
For ducted systems, has ductwork been installed in such a manner that air
resistance and leakage is kept to a minimum?
Is the ductwork fitted to the correct connections on the exhaust air heat pump?
Has all the exhaust ductwork been insulated?
Has the exhaust air heat pump and has all ductwork been effectively insulated where installed
in unheated spaces?
Is flow and return pipework connected correctly?
Is primary flow + return insulated?
Has system been completely flushed of air + charged to the correct pressure (2BAR) ?
Is heating expansion vessel correctly sized, secured and charged to the right pressure?
Has the correct size electrical circuit breaker been installed?
Has an electrical isolation switch been installed?
Has the correct size power cable been used for exhaust air heat pump?
See Page 12 for cable requirements
NO Pre Paid Meters
are to be installed on a
Victorum Exhaust Air Heat Pump System