Victorum Exhaust Air Heat Pump Installation Guide
13
Victorum EAHP Unit
First Fix Notes
Heat Pump
Breaker Size
HHH-2-0000-VHP
13Amp
Primary Pipework From Heat Pump To Pre-plumbed Unit
•
Minimum
pipe size 22mm copper or 25mm Multilayer
•
The primary pipework should be fully insulated and protected from water and mois-
ture.
•
The supplied flexible hose should be used for piping the condense outlet only, providing a
suitable air gap to the drain connection.
Electrical Supply And Cable Requirements
• Power supply to heat pump to be terminated with with a suitable isolator located next to the unit.
• Pre-moulded communication cable from Heat Pump unit to the pre-plumbed unit (Supplied by
Joule)
Communication
Location
Pre-moulded
communication cable
From Heat Pump unit
(Ethernet) to pre-plumbed
unit (Field Bus 1).
•
When installing the Heat Pump take great care to install as per the detailed notes for installa-
tion locations. The Exhaust Air Heat Pump must have minimum clearance of 300mm at the top
of the unit and 150mm at the bottom of the unit.
•
The Exhaust Air Heat Pump must not be installed in a location without these clearances available.
•
Condensation will form inside the Heat Pump during normal operation. Ensure the correct
pipework is used and that it has a continuous fall to the drain connection.
•
An adequate air gap is also required to allow the water to drain correctly.
•
The Exhaust Air Heat Pump must be installed vertically and be plumb and level.