5.1.1.3.1
Setting Snapshot Plan
The snapshot plan determines when the snapshots will be active.
Step 1
Select
Setting
>
Storage
>
Schedule
>
Snapshot
.
Figure 5-7 Snapshot
Step 2
Select snapshot type and set time period.
Green represents normal snapshot plan (such as timing snapshot); yellow represents motion
snapshot plan (such as snapshot triggered by intelligent events); red represents alarm
snapshot plan (such as snapshot triggered by alarm-in).
●
Method one: Select snapshot type, such as
Normal,
and click and drag the left mouse
button to set time period for normal snapshot on the timeline.
●
Method two: Manually enter a specific time period.
1. Click
Setting
next to a day.
Figure 5-8 Setting (snapshot time period)
2. Select a day, and the alarm type next to a period. Then set the period.
◇
Select
All
or checkboxes of some days to set the time period of multiple days at one
time.
125