l
Marker pen
l
M6 screws
l
Square-hole positioning pins (matching square-hole channels)
l
Round-hole positioning pins (matching round-hole channels)
Context
NOTICE
Stacking storage devices will damage devices; therefore, storage devices must be placed on
adjustable guide rails.
l
Each SUC is equipped with a pair of adjustable guide rails.
l
Guide rails can be flexibly adjusted from 600 mm to 900 mm, and installed in the cabinet
with a depth from 800 mm to 1200 mm.
l
Adjustable guide rails come preinstalled with square-hole positioning pins. If required,
change square-hole positioning pins to round-hole ones before installing adjustable guide
rails.
NOTE
You can find round-hole positioning pins in the accessory bag delivered with storage devices.
l
Three M6 screws are used to secure adjustable guide rails.
shows the screw
hole locations.
Figure 6-5
Screw hole locations
Procedure
Step 1
Install the left adjustable guide rail (with an L identifier).
NOTE
If there is no scale marked on the channels, mark the scale from the bottom 1 U position upwards. Be sure
to horizontally line up the front and rear of the adjustable guide rail.
OceanStor N8500 Clustered NAS Storage System
Installation Guide (for T Series V100R005)
6 N8500 Installation (with S5500T Storage System as the
Storage Unit)
Issue 02 (2015-09-22)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
107