NOTE
Installing adjustable guide rails delivered with a 4 U SUD is used as an example. For details on how to
install adjustable guide rails delivered with a 2 U SUD, see
6.5 Installing Adjustable Guide Rails for an
Procedure
Step 1
Install the left adjustable guide rail (with an L identifier).
NOTE
If there is no scale marked on the channels, you are advised to mark the scale from the bottom 1 U position
upwards. Be sure to horizontally line up the front and rear of the adjustable guide rail.
1.
Align the underside of the adjustable guide rail with the U marking on the front and rear
channels.
2.
Extend the adjustable guide rail until the front and rear positioning pins protrude through
the holes on the front and rear channels.
3.
Use M6 screws to secure the adjustable guide rail.
OceanStor N8500 Clustered NAS Storage System
Installation Guide (for T Series V100R005)
7 N8500 Installation (with S5600T, S5800T or S6800T
Storage System as the Storage Unit)
Issue 02 (2015-09-22)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
179