5.19 Connecting the CNEN to the Maintenance Terminal.................................................................................................74
5.20 Connecting SUCs to the Maintenance Terminal (PC)................................................................................................76
5.21 Connecting Ground Cables.........................................................................................................................................78
5.22 Connecting Power Cables...........................................................................................................................................82
5.23 Powering On the N8500.............................................................................................................................................84
5.24 Checking Indicators....................................................................................................................................................86
5.25 Installing a Front Panels.............................................................................................................................................93
6 N8500 Installation (with S5500T Storage System as the Storage Unit).............................95
6.1 Unpacking and Checking Goods..................................................................................................................................98
6.2 Removing a Filler Panel from a Cabinet....................................................................................................................101
6.3 Installing Adjustable Guide Rails for Clustered NAS Engine Enclosure..................................................................102
6.4 Installing a Clustered NAS Engine Enclosure............................................................................................................105
6.5 Installing Adjustable Guide Rails for an SUC............................................................................................................106
6.6 Installing an SUC........................................................................................................................................................109
6.7 Installing the Adjustable Guide Rails for an SUD.....................................................................................................110
6.8 Installing an SUD.......................................................................................................................................................113
6.9 Installing Adjustable Guide Rails for a Fibre Channel Switch..................................................................................115
6.10 Installing a Fibre Channel Switch............................................................................................................................118
6.11 Installing Adjustable Guide Rails for an Ethernet Switch........................................................................................119
6.12 Installing an Ethernet Switch....................................................................................................................................121
6.13 Installing a Filler Panel.............................................................................................................................................122
6.14 Affixing a Label........................................................................................................................................................123
6.15 Setting Up a Heartbeat Network for CNENs............................................................................................................124
6.16 Connecting CNENs to the Service Network............................................................................................................127
6.17 Connecting SUCs to CNENs....................................................................................................................................131
6.18 Connecting Multiple SUDs to One SUC..................................................................................................................134
6.19 Connecting the CNEN to the Maintenance Terminal...............................................................................................138
6.20 Connecting SUCs to the Maintenance Terminal (PC)..............................................................................................140
6.21 Connecting Ground Cables.......................................................................................................................................142
6.22 Connecting Power Cables.........................................................................................................................................146
6.23 Powering On the N8500...........................................................................................................................................148
6.24 Checking Indicators..................................................................................................................................................150
6.25 Installing Front Panels..............................................................................................................................................159
7.1 Unpacking and Checking Goods................................................................................................................................164
7.2 Removing a Filler Panel from a Cabinet....................................................................................................................167
7.3 Installing Adjustable Guide Rails for Clustered NAS Engine Enclosure..................................................................168
7.4 Installing a Clustered NAS Engine Enclosure............................................................................................................171
7.5 Installing the Adjustable Guide Rails for an SUC......................................................................................................172
7.6 Installing an SUC........................................................................................................................................................175
OceanStor N8500 Clustered NAS Storage System
Installation Guide (for T Series V100R005)
Contents
Issue 02 (2015-09-22)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
v