IDS1000-A Air-Cooled Container Data Center
All-in-One Maintenance Guide
5 Parts Replacement
Issue 01 (2016-01-10)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
133
Do not impact or strike the fire cylinder during transportation or installation.
Assign sufficient people for transportation and installation if no auxiliary tool is available.
Step 2
Disconnect the cables between the solenoid valve and the fire control panel, as shown in
Figure 5-49
Position of the interconnection cable
Step 3
Disconnect cables shown in