Parts Replacement
5.1 Replacing Power Supply and Distribution System
Components
5.1.1 Replacing a PD510
Prerequisites
A PD510 electricity meter needs to be replaced.
A spare PD510 electricity meter of the same model is available and functional.
If the condition allows, switch off the upper-level circuit breaker of the PD510 electricity
meter to be replaced.
Impact on the System
Certain services in the IDS1000 are interrupted.
Preparations
Tools: Phillips screwdriver, protective gloves
Material: spare PD510 electricity meter
Documents required: documents delivered with the PD510 electricity meter, initial
configuration table for the PD510 electricity meter
Skill requirement: power distribution system engineer
For the table, see the initial configuration guide.