FusionModule1000A40 ICT Solution
Maintenance Guide
4 Parts Replacement
Issue 01 (2019-03-05)
Copyright © Huawei Technologies Co., Ltd.
86
Figure 4-31
Pushing the air conditioner (2)
(1) 1.5 m long DN32 steel pipe
7.
Continue pushing forward the air conditioner until it is separated from the base and
placed onto the two steel pipes.
Adjust the positions of the two steel pipes and the distance in between to ensure that the air
conditioner is evenly carried on the two steel pipes.