FusionModule1000A40 ICT Solution
Maintenance Guide
4 Parts Replacement
Issue 01 (2019-03-05)
Copyright © Huawei Technologies Co., Ltd.
99
Procedure
Step 1
Label each cable based on the corresponding ports on the smart ETH gateway.
Step 2
Disconnect cables from the smart ETH gateway.
Step 3
Remove the faulty smart ETH gateway from the guide rails of the cable trough.
Step 4
Install the spare smart ETH gateway in the original position and connect the cables.
----End
Follow-up Procedure
Dispose of the removed ETH gateway that is confirmed faulty.
4.3.6 Replacing a Camera
Prerequisites
A spare camera of the same model is available and functional.
Impact on the System
Video surveillance stops.
Preparations
Tools: Phillips screwdriver, step ladder, protective gloves
Material: spare camera
Documents: documents delivered with the camera, management system initial configuration
table
Skill requirement: weak-current engineer
For the table, see the initial configuration parameter manual for the solution in use.
Procedure
Step 1
Remove screws securing the transparent cover of the camera body using a Phillips
screwdriver.