FusionModule1000A40 ICT Solution
Maintenance Guide
4 Parts Replacement
Issue 01 (2019-03-05)
Copyright © Huawei Technologies Co., Ltd.
104
Figure 4-46
Installing the signal SPD
Step 6
Close the door of the SPD box.
----End
Follow-up Procedure
Dispose of the removed signal SPD that is confirmed faulty.
4.3.9 Replacing an SD Card
Prerequisites
A spare SD card of the same model is available and functional.
Impact on the System
None
Preparations
Tools: camera screwdriver
Materials: spare SD card
Documents: monitoring device layout diagram
Skill requirement: extra low voltage (ELV) engineer