4 Parts Replacement
Issue 01 (2019-03-05)
Copyright © Huawei Technologies Co., Ltd.
84
Figure 4-29
Placing the steel plate and pipe
(1) 3 mm thick steel plate
(2) 1.5 m long DN32 steel pipe
4.
Push the air conditioner at the back towards the cold aisle at the front. Verify that the air
conditioner front bottom will be on the steel pipe placed in
conditioner is pushed about 100 mm away from the base.
This step requires two persons working together, one pushing the air conditioner from behind
and the other pulling the air conditioner at the front.