FusionModule1000A40 ICT Solution
Maintenance Guide
4 Parts Replacement
Issue 01 (2019-03-05)
Copyright © Huawei Technologies Co., Ltd.
87
Figure 4-32
Pushing the air conditioner (3)
Step 14
Refer to 3.2 Sliding Cabinets to push cabinets C1, C2, D1, and D2 towards the hot aisle to the
extremities, and lock the sliding bases under the cabinets.
After the cabinets are slid to the extremities, air conditioner D1 must be completely inside the
cold aisle, and must not touch any cabinet.