FusionModule1000A40 ICT Solution
Maintenance Guide
4 Parts Replacement
Issue 01 (2019-03-05)
Copyright © Huawei Technologies Co., Ltd.
98
When removing cables, label the cables with corresponding terminal ports for later
connection.
After removing cables, wrap exposed terminals with insulation tape.
Step 2
Remove the faulty AI/DI module from the cabinet.
Step 3
Install a new AI/DI module on the rack.
Figure 4-42
Installing an AI/DI module
Step 4
Connect cables to the new AI/DI module.
Step 5
Configure the AI/DI module based on the management system initial configuration table.
----End
Follow-up Procedure
Dispose of the removed AI/DI module that is confirmed faulty.
4.3.5 Replacing a Smart ETH Gateway
Prerequisites
A spare ETH gateway of the same model is available and functional.
Impact on the System
Devices connected to the ETH gateway will be disconnected.
Preparations
Tools: ESD wrist strap, ESD gloves, Phillips screwdriver, step ladder, label, marker
Materials: spare ETH gateway
Documents: none
Skill requirement: extra low voltage (ELV) engineer