2.
Reduce the weight by removing the bulk power supplies and cell boards. Place each on an
ESD approved surface.
CAUTION:
System damage can occur through improper removal and reinstallation of bulk
power supplies and cell boards. Refer to
Chapter 6: Removing and Replacing Components
,
for the correct procedures to remove and reinstall these components.
3.
Remove the systems left and right side covers.
NOTE:
The latest lift handles available for the 2-cell servers are symmetrical and can be
installed on either side of the server.
4.
Locate one handle and ensure the two thumbscrews are removed from its front flange.
5.
Insert the 2 protruding tabs on rear flange of handle into the slotted keyways in the server’s
chassis. See
Figure 3-5
.
Figure 3-5 Inserting Rear Handle Tabs into Chassis
6.
Align the screw holes in the handle’s front flange with the rack mounting holes in the server’s
rack mount flange. Secure with the two thumbscrews. See
Figure 3-6 (page 49)
.
48
Installing the Server
Summary of Contents for Integrity rx7640
Page 8: ...8 ...
Page 12: ...12 ...
Page 13: ...List of Examples 4 1 Single User HP UX Boot 101 7 1 Single User HP UX Boot 181 13 ...
Page 14: ...14 ...
Page 42: ...42 ...
Page 88: ...88 ...
Page 130: ...Figure 5 8 Core I O Button Locations OLR MP Reset 130 Server Troubleshooting ...
Page 140: ...140 ...
Page 176: ...176 ...
Page 184: ...184 ...
Page 191: ...Figure C 3 Planning Grid Computer Room Layout Plan 191 ...