Installing the controller
1.
Insert the new or serviced array controller into the MSA chassis controller bay (
1
).
2.
Push the controller in as far as it will go, making sure that the controller is seated, and then press the
latch handle inward until it is
fl
ush against the front panel (
2
).
1
2
15493
3.
If necessary, power on the MSA as instructed in
Connecting the Power
and
Applying power to
the MSA
.
NOTE:
Each time a system with two controllers is powered on or restarted, or if a second controller is
hot-plugged into a single-controller con
fi
guration, the
fi
rmware versions on the controllers are compared.
If the
fi
rmware versions on the two controllers are not the same, the controller LCD panel prompts to clone
the
fi
rmware from the controller with the latest version onto the other controller. For information, see
Cloning controller
fi
rmware
.
Verifying proper operation
After replacing the array controller, controller cache module, or cache module battery pack, verify that:
•
The controller Heartbeat LED is blinking.
•
The controller Fault LED is off.
•
No new error messages are displayed on the array controller LCD display panel.
After installing a new array controller, verify that the latest available
fi
rmware is installed. See
Array
controller
fi
rmware
for the following instructions:
• Determining the currently-installed
fi
rmware version
• Updating controller
fi
rmware
• Cloning controller
fi
rmware
• Recovering corrupted
fi
rmware
84
Customer replaceable components
Summary of Contents for AD510A - StorageWorks Modular Smart Array 1500 cs 2U Fibre Channel SAN Attach Controller Shelf Hard Drive
Page 8: ...8 ...
Page 12: ...12 About this guide ...
Page 18: ...18 Specifications ...
Page 60: ...60 LCD panel and message descriptions ...
Page 96: ...96 Capacity expansion and extension ...
Page 102: ...102 Hard drive failures and faulted LUNs ...
Page 108: ...108 SCSI hard drive firmware ...