HYDRAULIC BRAKE
15-28
Install the right step holder assembly.
Install and tighten the step holder mounting bolts to
the specified torque.
After the installation, check the brake operation and
adjust the rear brake light switch operation (page 3-
23).
TORQUE: 27 N·m (2.8 kgf·m, 20 lbf·ft)
STEP HOLDER ASSEMBLY
BOLTS
Summary of Contents for CBR125R
Page 38: ...MEMO...
Page 56: ...MEMO...
Page 84: ...MEMO...
Page 94: ...FUEL SYSTEM PGM FI 5 2 FUEL SYSTEM PGM FI COMPONENT LOCATION 1 2 N m 0 1 kgf m 0 9 lbf ft...
Page 214: ...CYLINDER PISTON 9 2 CYLINDER PISTON COMPONENT LOCATION...
Page 224: ...MEMO...
Page 260: ...CRANKSHAFT BALANCER TRANSMISSION 12 2 CRANKSHAFT BALANCER TRANSMISSION COMPONENT LOCATION...
Page 282: ...MEMO...
Page 392: ...MEMO...
Page 416: ...MEMO...
Page 417: ...20 1 20 20 WIRING DIAGRAMS ED E F II G type 20 3 CM type 20 4 U type 20 5...
Page 428: ...MEMO...