10-3
ALTERNATOR
INSTALLATION
Install the new gasket and dowel pins.
Install the left crankcase cover and tighten the bolt in a
crisscross pattern in several steps.
Tighten the choke cable stay bolts (2 nos.) to the specified
torque.
TORQUE: 9 N.m (0.9 kgf.m, 6.6 Ibf.ft)
Route the neutral switch wire to the left crankcase grooves.
Install the left crankcase rear cover (page 6-5).
NEUTRAL
SWITCH WIRE
CHOKE CABLE
STAY/BOLTS
ALTERNATOR 2P
CONNECTOR
IGNITION PULSE
GENERATOR
CONNECTOR
DOWEL
PINS
GASKET
Connect the alternator 2P connector and ignition pulse
generator wire connector.
Install the left side cover (page 2-3).
BOLTS
LEFT CRANKCASE COVER
Summary of Contents for CB HORNET 160R 2015
Page 1: ...SHOP MANUAL CB HORNET 160R CB HORNET 160R...
Page 38: ...MEMO...
Page 71: ...MEMO...
Page 72: ...5 0 FUEL SYSTEM 27 N m 2 8 kgf m 20 Ibf ft COMPONENT LOCATION...
Page 127: ...MEMO...
Page 128: ...8 0 CYLINDER PISTON COMPONENT LOCATION...
Page 137: ...MEMO...
Page 154: ...10 0 ALTERNATOR 74 N m 7 5 kgf m 55 Ibf ft COMPONENT LOCATION...
Page 243: ...MEMO...
Page 299: ...MEMO...
Page 319: ...MEMO...
Page 326: ...MEMO...
Page 327: ...19 WIRING DIAGRAM 19 1 STANDARD AND CBS CB HORNET 160R 19 1...
Page 333: ...MEMO...
Page 336: ...Honda Motor Co Ltd 2015 82K43P0 Published by Honda Motorcycle Scooter India Pvt Ltd...