2-23
3 The measurement is completed in four minutes, and coefficient (calculated value)
will be displayed.
If “Fault” is displayed for processing state, follow the instructions given in
“4.9 Viscometer maintenance.”
4 Press OK.
If the OK key is pressed when the process status is
“normal end”, the coefficient
will be registered, and the circulation control screen will be displayed.
2.6.2 Operation test of viscometer
●This function allows you to check the viscometer operation and measure the current ink
viscosity. Note that this operation test is not to determine the coefficient.
● It is not necessary to use new ink for operation test.
OK
Cancel
<the previous calibration>
Exec.time 2015/07/07 11:30
< the current calibration >
Exec.time 2009/07/07 12:45
Proc. Status: Ended
Viscometer calibration
HOME
[Stop ]
2015.07.07 12:45
Com=0
Plunger falling time
Plunger falling time
1st
2nd
5th
Average
3rd
4th
Ink temperature XX
( )
Standard X. XXX (mPa
▪
s)
X.XX (sec)
X.XX (sec)
X.XX (sec)
X.XX (sec)
X.XX (sec)
X.XX (sec)
1st
2nd
5th
Average
3rd
4th
Ink temperature XX
( )
Standard X. XXX (mPa
▪
s)
X.XX (sec)
X.XX (sec)
X.XX (sec)
X.XX (sec)
X.XX (sec)
X.XX (sec)
Coefficient XXXX
Coefficient XXXX
Ink viscosity XXX
When updating coefficient, press [OK].
Coefficient
OK
[Note]
The coefficient value will not be registered when Cancel is pressed instead of OK key.
[Standard value of the viscometer calibration] 1000 to 2000
*
The value stated above is a reference. There will be no problem even If the coefficient
value displayed is other than stated above as long as data of Plunger falling time fall
within a similar range.
Summary of Contents for IJ RX2
Page 1: ...Service Manual HITACHI Printer Model RX2 Revision Feb 2014 Version A ...
Page 13: ...1 8 2 External views Rear side 1 2 2 Main body internal ...
Page 14: ...1 9 1 2 3 Print head ...
Page 101: ...3 26 Circuit diagram of EZJ127A ...
Page 102: ...3 27 Circuit diagram of EZJ127B ...
Page 116: ...3 41 Circuit diagram of EZJ129 ...
Page 164: ...4 40 5 Reset the time of the R air filter to 0 on the Parts usage time management screen ...
Page 247: ...7 Attached Drawing 7 1 Circulation System Diagram Circulation System Diagram 7 1 ...
Page 249: ...7 3 7 2 2 Electrical Connection Diagram RX2 B Basic model 7 3 ...